Services
01 / SITE WORK
Building & Site Demolition
When a project starts with an existing structure, we can help take the property from an existing building to a clean, construction-ready site.
We coordinate demolition and site preparation with the planned grading and construction activities so the property can move efficiently into the next phase of development.
- Existing Building
- Demolition
- Clearing
- Grading
- Build-Ready Site
02 / SITE WORK
Lot Clearing & Site Preparation
Every successful construction project starts with proper site preparation.
We clear and prepare properties for the next phase of construction while maintaining an organized and efficient jobsite.
Whether we’re preparing an undeveloped lot or cleaning up after demolition, we establish the proper starting point for the project.
03 / SITE WORK
Bulk & Fine Grading
Proper grading is one of the most important parts of any site development project.
We perform both bulk earthwork and fine grading to establish building pads, drainage patterns, parking areas, roadways, and finished site elevations.
Our goal is to establish accurate elevations and properly prepared subgrades so the following phases of construction can proceed efficiently.
04 / SITE WORK
Complete Stormwater Management Systems
From Pond Excavation to Final Installation
Stormwater management is a critical part of site development.
We provide complete stormwater management installation, including the excavation and underground infrastructure required to properly manage runoff.
We can handle the earthwork and installation required to take a stormwater system from plans to completed construction.
05 / SITE WORK
Water Main & Water Service Installation
We provide water utility installation for site development projects, including water mains and service laterals.
06 / SITE WORK
Sewer Main & Sewer Lateral Installation
Our team also provides sanitary sewer installation as part of complete site development.
By combining underground utility installation with our grading and sitework capabilities, we can help simplify the construction process for our customers.
07 / SITE WORK
Parking Lot Preparation & Completion
From Subgrade to Finished Parking Area
A properly constructed parking lot starts long before the asphalt arrives.
We handle the site preparation necessary to establish a stable, properly graded base for the finished pavement.
Subgrade Preparation
Aggregate Base
We install and prepare the aggregate base required for the finished parking lot.
Concrete
We work with trusted local concrete contractors to complete the concrete portions of the project, including:
Asphalt Paving
Once the parking lot is properly prepared, we coordinate with trusted local asphalt contractors to complete the paving. We can coordinate:
Striping & Signage
We can coordinate the final details needed to make the parking lot ready for use:
08 / SITE WORK
Final Grading & Site Stabilization
Once the major construction work is complete, we bring the site together with final grading and stabilization.
09 / SITE WORK
Landscaping & Final Finish
A construction project isn’t complete until the property looks finished.
Through our landscaping division, we can complete the final appearance of the property following site construction.
This allows us to take a project from raw ground to a finished, usable property.
- Call : 302-730-0150
- Email : Info@fadoffice.net
- Service Area : Kent & Sussex County
Copyright © 2026. All rights reserved. Powered by ReBrand Gurus .